Anderson, S D, Patil, S S, Gibson, G E and Sullivan, G R (2004) Owner–Contractor Work Structures: Process Approach. Journal of Construction Engineering and Management, 130(05), 680–90.

Chinowsky, P S and Diekmann, J E (2004) Construction Engineering Management Educators: History and Deteriorating Community. Journal of Construction Engineering and Management, 130(05), 751–8.

Hanna, A S and Gunduz, M (2004) Impact of Change Orders on Small Labor-Intensive Projects. Journal of Construction Engineering and Management, 130(05), 726–33.

Hassanein, A and Moselhi, O (2004) Planning and Scheduling Highway Construction. Journal of Construction Engineering and Management, 130(05), 638–46.

Jung, Y and Woo, S (2004) Flexible Work Breakdown Structure for Integrated Cost and Schedule Control. Journal of Construction Engineering and Management, 130(05), 616–25.

Li, K Y K and Chan, A T (2004) Management of Radon in Tunnel Drilling. Journal of Construction Engineering and Management, 130(05), 699–707.

Mattila, K G and Bowman, M R (2004) Accuracy of Highway Contractor’s Schedules. Journal of Construction Engineering and Management, 130(05), 647–55.

  • Type: Journal Article
  • Keywords: Highway construction; Contractors; Scheduling; Construction management; scheduling; road building; construction; contracts;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)0733-9364(2004)130:5(647)
  • Abstract:
    Contractors are required by the Michigan Department of Transportation (MDOT) to submit a progress schedule identifying the controlling path of activities for a construction project. During the 2000 construction season, MDOT allowed contractors to submit a progress schedule with overlapping or concurrent controlling operations. Prior to this, only one activity at a time could be controlling on the progress schedule. This paper reports on the results of a research project where the focus was to examine the accuracy of the progress schedules, which only list controlling items. Eight construction projects were studied and a determination of progress schedule accuracy was made. This was done to determine if there was an increase in accuracy of the schedules when concurrent controlling operations were used. Included in the eight projects were four without concurrent controlling activities and four with concurrent controlling activities. A comparison based upon similar projects with and without concurrent activities was made. Additionally, 22 projects were analyzed, all without concurrent controlling activities, to determine the accuracy of progress schedules for two types of projects. The comparison revealed that, in three of the four cases, the accuracy of progress schedules increased with the allowance of concurrent controlling activities. The 22 projects revealed that the accuracy of progress schedules varied considerably. It was also determined that contractors overestimated the duration of activities included in progress schedules.

Park, M and Peña-Mora, F (2004) Reliability Buffering for Construction Projects. Journal of Construction Engineering and Management, 130(05), 626–37.

Scott, S and Harris, R A (2004) United Kingdom Construction Claims: Views of Professionals. Journal of Construction Engineering and Management, 130(05), 734–41.

Senghore, O, Hastak, M, Abdelhamid, T S, AbuHammad, A and Syal, M G (2004) Production Process for Manufactured Housing. Journal of Construction Engineering and Management, 130(05), 708–18.

Touran, A, Atgun, M and Bhurisith, I (2004) Analysis of the United States Department of Transportation Prompt Pay Provisions. Journal of Construction Engineering and Management, 130(05), 719–25.

Trigunarsyah, B (2004) Constructability Practices among Construction Contractors in Indonesia. Journal of Construction Engineering and Management, 130(05), 656–69.

Wong, C H (2004) Contractor Performance Prediction Model for the United Kingdom Construction Contractor: Study of Logistic Regression Approach. Journal of Construction Engineering and Management, 130(05), 691–8.

Zhang, X (2004) Improving Concessionaire Selection Protocols in Public/Private Partnered Infrastructure Projects. Journal of Construction Engineering and Management, 130(05), 670–9.

Zhong, D, Li, J, Zhu, H and Song, L (2004) Geographic Information System-Based Visual Simulation Methodology and Its Application in Concrete Dam Construction Processes. Journal of Construction Engineering and Management, 130(05), 742–50.